Typically, completing a building construction takes six to seven months. It could be longer than that, so for an owner or builder to fasten the process, better to double the time in labor and resources. Or one should look at each factor that takes the longest time to do in building construction.
8 aspects of building construction that takes time to do
A building construction project simply requires careful planning and execution. It has different phases, which also have subparts. But you can adjust and fasten some activities using a construction method or simplified features.
- Designing the building: Getting the design and engineering right is not an overnight task. These involve significant consulting time with professionals and assessing factors crucial to the project. Additionally, the more complex the plan, the more it takes longer. Complex projects often demand engineering and architectural work more than simpler ones. Because of this, even the planning and preparation stage can consume more time.
Remember also the phases of building construction are interconnected. A delay on a part can also hinder other activities from starting or executing.
- Ordering materials: It is ideal to order building materials in advance and have them all set before construction begins. An issue related to this is the availability of materials. Although there are various choices, some are only available in specific places.
- Obtaining permits and inspection: A project must have appropriate permits before construction begins. Local authorities take time to check a plan, see if it conforms to regulations, and perform inspection rounds.
They conduct building inspections throughout the process. Each time may demand time, especially if there are corrections in the project.
- Site preparation: Not all land is construction-ready right away. Some have complex features, so there’s a demand for thorough clearing, leveling, and preparing before forming the building’s foundation.
- Laying foundation: A time-consuming excavation may also be necessary to prepare the foundation of a new building. Sometimes, digging trenches for electrical wiring, plumbing pipes, or footings can take several days or weeks. Additionally, parts of laying a foundation are pouring concrete slabs, installing footings, and reinforcing steel.
- Installing utilities: Utility hookups can be challenging in some areas because these depend on local infrastructure. Thus, checking and arranging access to electricity, water, and other services at once is good.
- Building framing: Some framing methods, like light-gauge framing, can be faster than others. But generally, building involves constructing walls and floors. Then, assemble support beams and other structures necessary for a safe and stable system.
- Finishing: Depending on the design or additional features, the finishing phase could take time. It’s when the interior gets drywall, flooring, ceilings, cabinetry, plumbing fixtures, insulation, and electrical wiring.
Factors that can delay building construction
Besides the fundamental aspects of building construction, critical matters such as the availability of skilled labor and extreme weather can hinder the entire construction project at any time.
- Availability of skilled labor – Similar to obtaining materials, access to experts specializing in a modern or particular construction type may also be challenging. Additionally, hiring personnel could sometimes have no definite timeline.
- Acts of nature – Inclement weather can play a role in slowing down the completion times for building projects. Workers must be careful when extreme temperatures, high winds, or rainfall occur. It is for their safety and working conditions, as well as for the security of the structure.
In conclusion, it’s the complexity of the project or the availability of materials and labor forces that takes the longest time in a building construction.